Microtunnelling and direct pipe

1401 – Tavazzano (Lodi – Italy)

Works:
Construction of a microtunnel as part of the construction of the Cervignano d’Adda - Corneliano Laudense pipeline (Italgas storage connection) ND1050 (42") DP 75 bar.

Buyer:
Snam Rete Gas

Contractor:
Max Streicher S.p.A.

Period of Execution:
May 2018 - September 2018

Works Amount:
€ 922.460,00

Description

The natural gas pipeline route involves the crossing of the national road no. 9, via Emilia, and its road connector by executing a microtunnel with tubular r.c. segments.
The r.c. pipeline has an internal diameter ID1600 mm for a total length of approximately 219 m; the microtunnel has a curvilinear route with a vertical radius of curve approximately 1.200 m, dug in predominantly sandy loam soils, in the presence of groundwater.
The works were successfully completed without slowing down road traffic and without any settlement.