Extension of the RATP metro line 14 in Paris – Construction of the station “Porte de Clichy”.

Execution of foundation works and soil treatment: diaphragms with hydromill, preliminary compensation injections, treatment and impermeability injections, jet-grouting, disjoint metal profiles bulkhead, soil freezing.

 

Client: RATP

Project Manager: SYSTRA

Main contarctor: EIFFAGE TP, RAZEL BEC

Execution period: July 2014 – present

Works value: Diaphragms with hydromill and bucket pre-excavation, preliminary compensation injections,  treatment and impermeability injections, jet-grouting, bulkhead,  disjoint metal profiles bulkhead, soil freezing   €  30 444 000,00