Construction of TWO  Direct Pipe crossings called “Cave Danesi A” and “Cave Danesi B” as part of the works for the construction of the Snam Rete Gas Zimella – Cervignano DN 1400 (56”) pipeline, DP 75 bar – Lot 3 – total length of approx. 53.100 km

 

Customer: Snam Rete Gas  S.p.A.

Execution period: December 2013 – June 2014

Project value: € 5.174.000,00